Resolution Copper to remove hazardous materials from West Plant

Facebooktwitterredditpinterestlinkedinmailby feather

Abatement work from historic mining activity enters next phase

An aerial view of the historic Magma Smelter Site.

 Superior, Ariz. — (July 27, 2018) As part of the ongoing reclamation work at Resolution Copper’s West Plant site, activities to remove hazardous materials from smelter buildings, including asbestos, will begin Monday, Aug. 6. Resolution Copper submitted formal notification of its abatement plans to Pinal County Air Quality Control District last week. Work crews will be using mobile equipment, and trucks. These vehicles associated with abatement activities, which are scheduled to occur weekdays from Aug. 6 through Sept. 14, will use the site’s rear entrance in order to minimize disruption to downtown traffic.

  The health and safety of workers and the community is the highest priority. In order to ensure that all work is done in the safest manner possible, abatement of hazardous materials from buildings slated for removal is an important step prior to demolition activities. In the notification provided to Pinal County, Resolution Copper identified the mechanisms for removing the materials containing asbestos from the smelter buildings, along with the specific measures the company will take to prevent emissions of asbestos into the air during the work. 

   “We are focused on completing this work in a way that protects the health of our workers and our neighbors in Superior,” said Dr. Casey McKeon, Resolution Copper Environmental Manager. “Our team will use standard abatement and removal techniques, including abating certain materials inside negative air enclosures and using wet abatement techniques. We’ll also conduct air monitoring of our workers and along the site perimeter throughout the abatement and demolition process as an additional safety measure.”

   Resolution Copper has contracted Environmental Resources Management, a firm specializing in environmental, health, safety and sustainability services, to manage demolition activities at the smelter complex. For more information, visit www.erm.com

  Resolution Copper will continue posting project updates on our website at https://resolutioncopper.com/shape-whats-next/west-plant-reclamation/ and on social media.

   For questions, concerns or comments about upcoming abatement activities at Resolution Copper’s West Plant site, please contact the company at community-complaint@resolutioncopper.com, or call (520) 689-3955.

About Resolution Copper

The Resolution Copper Project is operated by Resolution Copper Mining, which is a limited liability company owned 55 percent by Resolution Copper Company (a Rio Tinto PLC subsidiary) and 45 percent by BHP Copper Inc. (a BHP Billiton PLC subsidiary).

Staff (5795 Posts)

There are news or informational items frequently written by staff or submitted to the Copper Basin News, San Manuel Miner, Superior Sun, Pinal Nugget or Oracle Towne Crier for inclusion in our print or digital products. These items are not credited with an author.


Facebooktwitterby feather
Facebooktwitterredditpinterestlinkedinmailby feather

Comments are closed.

  • Additional Stories

    Annual San Manuel Copper Classic motorcycle race returns March 9

    February 4th, 2024
    by

        Well, they will be at it again. The Trail Riders of Southern Arizona (TRS) will be hosting the […]


    Strong Start to Superior’s 2024

    February 4th, 2024
    by

    Our great town has entered 2024 at hypersonic speed, and we are excited about the many major milestones we have […]


    Rep. Gallego visits Superior

    February 4th, 2024
    by

      Rebuild Superior Inc and the Superior Enterprise Center hosted Representative Ruben Gallego for a regional round table luncheon at […]


    Winkelman Preparatory Academy plans expansion

    February 4th, 2024
    by

    By Mila Besich   When the school year first started in August of 2023, 16 young girls began attending the […]


  • Additional Stories

    New welding facility open for regional learning in Superior

    February 4th, 2024
    by

      By Nathaniel A. Lopez   It’s official.   On Jan. 23, members of Superior Town Council, Rebuild Superior, Resolution […]


    Queen Creek Bridge replacement project begins on US60; full closures will be required between Superior, Miami for blasting

    February 4th, 2024
    by

      SUPERIOR – The Arizona Department of Transportation is replacing two bridges on US 60 east of Superior with spans […]


    Pinal County hosts vaccine clinics in Kearny, Mammoth

    February 4th, 2024
    by

        On Jan. 14, the Pinal County Animal Care and Control offered low-cost vaccines to local pet owners in […]


    OWN Oracle to disband; Oracle Visitors Center to close

    February 4th, 2024
    by

      By Nathaniel A. Lopez   After many years of service in the Oracle, and surrounding communities, OWN-Oracle Women’s Network, […]


  • Copperarea

  • Southeast Valley Ledger