SR 77 Aravaipa Creek Bridge replacement project: Construction scheduled through spring 2015

Facebooktwittergoogle_plusredditpinterestlinkedinmailby feather

The Arizona Department of Transportation is set to begin a construction project this month to replace the Aravaipa Creek Bridge on State Route 77, which is located about 15 miles north of Mammoth (milepost 123-124). 

  The project includes removal of the existing structure and replacing it with a new concrete bridge. In addition, the project includes installing new guardrails and widening SR 77 to align with the new bridge.

  The bridge will be replaced in two separate construction phases over the next year. Initially in phase I, the northbound lane on the bridge will be closed to traffic while the southbound bridge structure is constructed. Then in phase II, work will take place on the northbound bridge with traffic using the new bridge. Each phase will last about six months with the project anticipated to be completed in spring 2015.

  During construction there will be one lane in use and temporary traffic signals will be at each end of the bridge to alternate northbound and southbound traffic across the bridge.

  For more information call ADOT’s project information line at 1.855.712.8530 or email at Projects@azdot.gov.

Staff (4402 Posts)

There are news or informational items frequently written by staff or submitted to the Copper Basin News, San Manuel Miner, Superior Sun, Pinal Nugget or Oracle Towne Crier for inclusion in our print or digital products. These items are not credited with an author.


Facebooktwittergoogle_plusredditpinterestlinkedinmailby feather
Facebooktwitterby feather

Comments are closed.

  • Additional Stories

    A Christmas Murder in Globe: The Owl Buffet Shooting

    January 15th, 2018
    by

    Early Christmas morning 1944, the Owl Buffet in Globe, AZ was the scene of a tragic shooting.   At around […]


    Superior Chamber to host 10th annual Superior Home and Building Tour

    January 15th, 2018
    by

      Have you ever wondered what the insides of some of the homes in Superior look like?    We have […]


    From Filmmaker to Artist: Exploring the World of Deborah Kay

    January 15th, 2018
    by

      Deborah Kay, artist and filmmaker, fell in love with Superior while out scouting for a new location for her […]


    San Manuel alum Warner Smith loses battle with ALS

    January 15th, 2018
    by

      All Warner Smith wanted was a fighting chance, and like he did on the gridiron at San Manuel High […]


  • Additional Stories

    Along the Gila: Things are Coming Together for the Copper Basin Chamber

    January 15th, 2018
    by

    It did my heart good to observe the meeting of the Pioneer Days committee of the Copper Basin Chamber of […]


    HLI Copper Corridor graduates new leaders

    January 15th, 2018
    by

      The Copper Corridor Economic Development Coalition has partnered with Valle del Sol for the past three years to host […]


    United States Forest Service finalizes plan to protect Apache Leap; approval comes after detailed consultation with stakeholders

    January 15th, 2018
    by

      The United States Forest Service has finalized plans for the Apache Leap Special Management Area (SMA) to protect the […]


    Lane closure continues on State Route 77 near Mammoth

    January 15th, 2018
    by

      The Arizona Department of Transportation advises drivers to plan for the following restriction on SR 77 near Mammoth as […]


  • Copperarea

  • [Advertisement.]
  • [Advertisement.]
  • [Advertisement.]
  • Southeast Valley Ledger