ASARCO plans $100 million upgrade of Hayden smelter to meet new EPA sulfur dioxide emission limits; Project not expected to disrupt operation of plant or employees’ hours

facebooktwittergoogle_plusredditpinterestlinkedinmailby feather

Asarco Smelter in Hayden

Copper Area News

Plans for a $110 million upgrade of the Hayden copper smelter that will bring the apparatus in compliance with new federal regulations concerning emissions of sulfur dioxide (SO2) have been filed by owner ASARCO/Grupo Mexico with the Arizona Department of Environmental Quality (ADEQ).

The rules issued by the US Environmental Protection Agency (EPA) require that SO2 emissions from the smelter be reduced from 140 ppb (parts per billion) to 75 ppd during a 24-hour period. The Hayden smelter has until Oct. 3, 2018 to meet this standard.

Meeting the standard is important to keep the Hayden copper smelting plant operating and providing employment for residents of the Hayden/Winkleman area.

To meet EPA’s goal, the plan ASARCO filed on June 24 with ADEQ describes a converter retrofit project that will replace the smelter’s five current 13-ft. diameter converters with three 15-ft. diameter converters. Also included in the plan are the installation of improved primary and secondary hoods, and an electrostatic precipitator for solids removal prior to SO2 recapture at the smelter’s existing acid plants. Larger ladles (300 cu. ft. instead of 200 cu. ft.) will be installed to reduce the number of hot metal transfers. Additional upgrades will capture secondary gases and direct them to the acid plant for conversion to a sulfuric acid product.

Overall the plan aims to reduce SO2 emissions at the Hayden smelter by 85 percent, with a total SO2 capture rate of 99.7 percent of what is produced during the copper smelting process.

The plans were made public during a meeting of the Arizona House Committee on Energy, Environment and Natural Resources held Aug. 22 at the Gila Community College Pueblo Campus in Globe.

ADEQ is expected to rule on the ARARCO plan by late September. If approved the plan will then go to EPA for an additional 45-day comment period. With EPA approval, ASARCO could begin work on the upgrades before year’s end.

Work on the converter retrofit will be performed as to not disrupt the operation of the smelter and keep all employees working their regular daily schedules, said Krishna Parameswaran, director of environmental services and compliance assurances at ASARCO. The smelting plant must operate within the EPA emission limits by Oct. 3, 2018.

The smelter and surrounding operations are an important parts of the Hayden economy. It employs 1,400 hourly and salaried workers, who are annually paid $140.8 million in wages, salaries and fringe benefits. The operations also generate $28.6 million in property, severance and sales taxes. The company annually generates spending of $345.8 million on materials, fuel and supplies into the Arizona economy.

Each year the Hayden smelter produces more than 300 million tons of copper that is important in all electrical products, electronic equipment, and even bringing electricity to homes, according to Kelly Norton, president of the Arizona Mining Association. The smelter also products more than 575,000 short tons of sulfuric acid each year.

Although originally built in 1912, the Hayden smelter has been expanded and upgraded on a regular basis, with the last major renovations taking place in 1989 and 1996. In 2012, ASARCO voluntarily undertook a $10 million project to reduce lead emissions through the addition of a monitor system to keep lead emissions to within EPA rules issued in 2008 that trimmed allowable emission levels to one-tenth of the former standard.

The EPA-required Hayden smelter renovation projects comes only a step behind a more expensive project for the smelter in Miami owned by Freeport-McMoRan. Budgeted at $450 million, the Miami smelter will receive new converter mouth covers, converter aisle canopy hoods and aisle scrubbers, an anode plant bag house and a smelter furnace upgrade to meet EPA SO2 emission limits.

Freeport-McMoRan received its permit on July 21 and has begun renovation work that could be completed by the end of 2017. The Miami smelter, which was originally built in 1915, also has undergone numerous upgrades, expansions and renovations in the interim.

Norton emphasized at the meeting that copper smelting is an important contributor to the Arizona economy. At present there are only three copper smelting plants in the US and two are in Arizona (Hayden and Miami). The third is in Salt Lake County, UT, Norton noted.

James Hodl (33 Posts)

James J. Hodl is a career journalist who has worked for newspapers, magazines and trade journals. A graduate of Southern Illinois University with a Bachelor of Science degree in Journalism, Hodl began his career as a reporter with the Palatine (IL) Herald and the Morton Grove (IL) Review before becoming editor of the trade publication Appliance Service News. In recent years, Hodl has had articles published in Consumers Digest, Good Housekeeping, Home Remodeling, Kitchens & Baths and Salute; and has contributed to trade publications serving the home furnishings, restaurant and casino markets. A native of Chicago, Hodl relocated to San Tan Valley in 2013.


facebooktwittergoogle_plusredditpinterestlinkedinmailby feather
facebooktwitterby feather

Comments are closed.

  • Stories Just Posted

    Hall of Fame set to induct seven new members

    March 3rd, 2015
    by

    There is no doubt that over the course of 80 plus years the Superior Unified School district has educated and graduated some of the finest student.


    Superior Student’s of the Month enjoy lunch with Rotarians

    March 3rd, 2015
    by

    Superior Sun Superior Rotarians gladly sponsor the Superior Student’s of the Month each month with a luncheon at Los Hermanos Restaurant.


    Eight returning starters, experience give Panthers high expectations

    March 3rd, 2015
    by

    Superior Sun Last year, the Superior baseball team finished its season with a record of 11 – 9, including 7 – 7 in section play.


    Final registration dates for T-Ball coming up

    March 3rd, 2015
    by

    The final day to register T-Ball players for the Superior Little League is Friday, March 6, 2015.


  • Stories Just For You

    Boxing goes from hobby to career for Superior High grad

    March 3rd, 2015
    by

    Superior Sun Carlos Reyes, a 1995 graduate of Superior High School, had a different outlook on a boxing career as an 18-year old Pima College student, who was studying physical


    Great turn out for 5th annual Women’s Expo in Winkelman

    March 3rd, 2015
    by

    Copper Basin News The fifth annual Women’s Expo held at the Hayden High School was a fun filled day with good food, fun, learning, laughing, shopping and prizes! The vendors


    Music, food, telescope viewing celebrates Dark Sky Park designation

    March 3rd, 2015
    by

    A day-into-night celebration is set at Oracle State Park Center for Environmental Education on Saturday, March 21, to honor its designation as an International Dark Sky Park — only the 20th


    San Manuel Sea Lions finish second at regional championship meet in Yuma

    March 3rd, 2015
    by

    The Regional Age Group Championship Swim Meet was held Feb. 20-22 at the Valley Aquatic Center in Yuma, Ariz.


  • Facebook

  • [Advertisement.]
  • Arizona Headlines & Current Weather